Donaldson Service Resources
Manufacturer service information starting point; equipment-specific intervals remain buyer controlled.
View detailsResource Guide
The cabinet ID stays when a filter is changed. The filter element, work order and next planned check do not. A useful service label makes those layers obvious at the point of work.
Published 2026-10-06
Digital proof before production. Material and adhesive options are discussed according to your application requirements.

Keep a stable equipment ID on the housing or cabinet. Mark the replaceable filter position separately if more than one element is present. A service sticker should distinguish a planned date from a completed replacement date, and a blank field should remain blank until the responsible technician fills it. Do not preprint REPLACED on a label for work that has not happened.
Imagine a maintenance visit to a cabinet with an intake and an exhaust filter. The door carries a stable AHU-03 ID. A work order refers to the intake element, while a prior sticker on the exhaust side shows a different date. This is a composite situation, not a reported customer case. If both stickers simply say FILTER and a date, a technician may update the wrong position. Position IDs and explicit date fields connect the physical element to the maintenance record.
The cabinet ID identifies the asset; the element position identifies what is being serviced; the work order records the actual action and responsible person. Donaldson provides product and service resources for filtration, but a supplier page does not set a universal replacement interval for your installation. The equipment owner should specify the element, criteria and service schedule from the actual system documentation.
Manufacturer service information starting point; equipment-specific intervals remain buyer controlled.
View detailsChoose a visible stationary area next to the correct access point, not across a hinge, latch, warning or manufacturer plate. If the housing is washed or exposed to oil, provide those conditions for sample testing. Decide whether the service field is handwritten, overprinted or replaced with each event. Test legibility after the expected routine, including gloves, lighting and access space.
Send cabinet and filter-position photos, approved field names, date format, number of positions, label dimensions, surface material, exposure and replenishment method. Include a sample work order with fictional identifiers for layout proof. Request separate artwork for permanent equipment ID and replaceable service labels when their update cycles differ.
FAQ
No. Use a clearly marked planned date field if needed, and record completed work only after the responsible technician confirms it.
The cabinet ID identifies the overall equipment. Add a position ID when multiple elements could be confused.